Industrial Construction
D.G. Hunter Power Plant Metal Building
The erection of a 20,700 square foot metal building with interior power grid rooms and an automative vent system.
Industrial Construction
UTLX Furnace Building II
New construction of a metal building facility to house the expansion of UTLX’s furnace.
Cleco BREC
Construction of a new metal building with a heavy foundation. The building also included a fully operational overhead crane system.
Industrial Construction
Port Transit Warehouse Expansion
13,000 square foot expansion of the existing Alexandria Port Transit Warehouse.